The visible amount is only the start
Photos help us understand the volume, but the type of material matters too. Loose household contents, dense material, built-in items and mixed debris can require different handling.
Labor before loading changes the job
A cleanout may be ready to load, or it may still need sorting, bagging, carrying, disassembly or removal from cabinets, sheds and other spaces.
The quote needs to reflect the work that happens before anything reaches the truck or container.
- Stairs, elevators, long carries and narrow access
- Sorting or separating material
- Items that must be broken down or disconnected
- Material spread across several rooms or structures
- Conditions that limit where a vehicle or container can go
Use an approved matrix before using numbers
The factors can be explained now. An actual number or range should wait until the KH Pricing & Qualification Matrix is approved and the request is placed in the right lane.
Describe the material, rooms or areas involved, access path and work needed before loading.